Stripe
POPULARSaaS Billing
SaaS multi-tenant subscription billing & customer portal
Build conflict-free weekly schedules around staff availability, eliminate runaway overtime costs, and approve shift swaps in one place. Powered by automated constraint optimization.
Engineered for Independent & Multi-Unit Operators

Managing an hourly team shouldn’t mean spending 15 hours every week fixing spreadsheets, texting back-and-forth, and paying overtime fines.
Eliminate messy group texts and double-booked shifts.
Stop juggling handwritten sticky notes, WhatsApp threads, and stale Excel sheets. Staff submit weekly availability and blackout dates directly in the app, preventing double-bookings before schedules are made.
Protect labor margins before rosters are published.
Unplanned 1.5x overtime and missed meal break penalties silently drain restaurant margins. AlkaShift enforces hard 40-hour pre-flight caps and audits 30-minute California/FLSA lunch lockouts.
Fill emergency openings in minutes, not hours.
When a line cook or server calls in sick two hours before dinner rush, the Emergency Shift Radar instantly notifies qualified, zero-overtime peers to claim the open slot with one tap.
From staff availability to the live dinner service rush, run your floor on a single unified loop.
Frontline staff submit recurring weekly availability, specific day blackouts, and PTO requests from their mobile phones. Approved shifts sync live to Google, Apple, or Outlook calendars.
Click "Generate Schedule" to solve complex restaurant constraints in seconds. The engine balances role qualifications, labor budget curves, and fair workweek rules with zero double bookings.
Staff punch in at the front-desk tablet kiosk with individual 4-digit PINs. Shift trades are peer-matched with overtime checks, requiring just a single tap for manager sign-off.
See how multi-unit restaurant, cafe, and fitness operations eliminate administrative friction, eradicate overtime leaks, and accelerate shift velocity.
18 hrs lost weekly to manual phone trees, paper PTO notes & Excel rosters
Google OR-Tools CP-SAT solver builds balanced, role-qualified rosters in seconds
Unplanned overtime spikes, manual punch disputes, and missed break penalties
Pre-flight 40h overtime threshold and PostGIS geofenced clock-in validation
Frantic 6 AM manager phone trees and text threads to replace callouts
Peer-to-peer 1:1 swaps, open shift claims, and automated Twilio SMS / Web Push
Average 4.8 hours to track down replacement coverage and verify qualifications
Open shifts broadcast to qualified staff with manager 1-click approvals in unified Inbox
Four interconnected engines designed to eliminate scheduling friction, stop time theft, and autonomously prevent overtime and labor compliance violations across distributed workforces.
Stop spending weekends manually balancing shift rosters in spreadsheets. AlkaShift generates optimized schedules around employee availability, role qualifications, and labor budget curves in seconds—backed by automated 40-hour overtime prevention.
Switch seamlessly between Gantt timeline and dense spreadsheet matrix with magnetic snap-to-slot precision, live conflict flags, and the reusable Shift Templates drawer with 1-click Copy Week.
Enforce primary & secondary roles, PTO exclusions, and select between Strict 40h Lock, Discourage OT (Weighted Penalty), or Uncapped Demand.
Attach reusable staffing models—Demand-Based, Fixed Rotations, or Rule-Based—per location, balancing hours equality vs. wage minimization.

Mount any shared tablet at the front desk for fast, PIN-verified clock-ins. Enforce mandatory 30-minute California/FLSA lunch lockouts, record voluntary break attestations upon punch-out, and automate daily proportional tip pooling.
Mount any tablet at the front desk for fast, anti-buddy-punching PIN attendance with 30s auto-reset, session exit guards, and supervisor org scoping.
Strict 1800-second lockout timer blocks premature clock-in from lunch breaks under California/FLSA labor law, with manager override audit logs and voluntary clock-out break attestations.
Automatically calculate and distribute daily tip pools based on hours worked proportionality or role points weighting, exportable to Gusto, ADP, or Square Payroll.
Draw multi-point geofence perimeters with PostGIS precision, paired with OpenStreetMap Nominatim automated address geocoding for instant branch setup.

Give your frontline staff schedule flexibility while keeping managers in full control. Qualified peers trade shifts with automated 40-hour overtime verification, while 1-tap emergency callouts broadcast to available staff instantly.
Employees trigger a 1-tap "Call in Sick" that atomically releases the shift to qualified staff, files approved sick leave, and dispatches urgent Twilio SMS alerts to management.
Mathematical gate validates role qualification, branch location assignment, schedule overlap, PTO conflicts, and 40h weekly overtime threshold before allowing trades.
Centralized approvals queue for peer-to-peer 1:1 reciprocal swaps, one-way transfers, and open marketplace claims with side-by-side cost variance telemetry.

Know exactly who is clocked in, on break, or running late at a single glance. Ensure opening/closing SOP checklists are completed, broadcast pre-shift announcements, and log end-of-shift manager handoffs.
Role-scoped channels (#general, #announcements) with instant pub/sub message delivery, online indicators, and broadcast restrictions preventing employee chat clutter.
Blocks clock-in until frontline staff digitally read and acknowledge critical manager shift announcements, daily specials, and safety briefs.
Automated opening/closing checklists assigned to shifts upon punch-in, plus categorized digital logbook notes (Maintenance, Cash Variance, Shift Handoff).
Conversational assistant equipped with live API tools to query rosters, check open shifts, and assist managers with rapid floor resolution.

Whether you run floor operations, oversee multi-unit labor margins, govern organizational security, or work frontline shifts, AlkaShift delivers a tailored command center with zero compromises.
Stop firefighting callouts and scrambling with paper shift notes. AlkaShift equips floor managers with shared tablet kiosk supervision, 30-minute meal break lockout enforcement, real-time WebSocket team chat, digital shift logbooks, and 5 master schedule views (including the high-density Weekly Matrix).
Supervise front-desk iPad PIN clock-ins and enforce California/FLSA 30-min lunch lockouts with audited manager overrides and anti-buddy-punching guards.
Role-restricted WebSocket messaging (#general, #announcements) with mandatory pre-shift announcement acknowledgment gates blocking punch until safety briefs are read.
Switch between Timeline, Cards, Month, Mobile Agenda, and the high-density Weekly Matrix tracking employee hours across 7 days with Shift Templates drawer.

AlkaShift acts as the central nervous system for your workforce telemetry. Unify POS punch data, live floor sales, automated wage calculations, and enterprise payroll without brittle CSV exports or manual reconciliations.
SaaS Billing
SaaS multi-tenant subscription billing & customer portal
POS & Sales
Live sales volume & roster matching
Payroll & Tax
Automated hour calculations & tax withholdings
POS Telemetry
Table-to-clock floor labor telemetry
POS & Hardware
Shift break compliance & checkout lock
Restaurant POS Sync
Restaurant sales volume and labor target sync
Enterprise Payroll
Bi-directional enterprise roster & wage sync
Enterprise HRIS
Enterprise single sign-on & multi-unit org hierarchy
Accounting & GL
Automated general ledger & payroll journal entry
SaaS Billing
SaaS multi-tenant subscription billing & customer portal
POS & Sales
Live sales volume & roster matching
Payroll & Tax
Automated hour calculations & tax withholdings
POS Telemetry
Table-to-clock floor labor telemetry
POS & Hardware
Shift break compliance & checkout lock
Restaurant POS Sync
Restaurant sales volume and labor target sync
Enterprise Payroll
Bi-directional enterprise roster & wage sync
Enterprise HRIS
Enterprise single sign-on & multi-unit org hierarchy
Accounting & GL
Automated general ledger & payroll journal entry
SMS Notifications
Instant shift broadcast SMS, swap confirmations, and urgent callout pings
Calendar Feed
Live RFC 5545 iCalendar (webcal://) feed automatically syncing shifts to Google, Apple, or Outlook
Team Comms
Instant shift drop alerts & manager swap approvals
Payroll & Tax
Automated shift attendance, tips, and wage exports formatted for Paychex Flex
Payroll & Tips
Native hours, tips, and wage export for Square-based hospitality operators
Geocoding & Location
Automated physical address geocoding and coordinates resolution proxy
Transactional Email
Automated transactional email dispatch for schedules, swaps, and security notices
Biometric Security
Enterprise FIDO2 biometric authentication (Face ID, Touch ID, Windows Hello)
Developer API
Event-driven webhook subscriptions and bi-directional REST endpoints
SMS Notifications
Instant shift broadcast SMS, swap confirmations, and urgent callout pings
Calendar Feed
Live RFC 5545 iCalendar (webcal://) feed automatically syncing shifts to Google, Apple, or Outlook
Team Comms
Instant shift drop alerts & manager swap approvals
Payroll & Tax
Automated shift attendance, tips, and wage exports formatted for Paychex Flex
Payroll & Tips
Native hours, tips, and wage export for Square-based hospitality operators
Geocoding & Location
Automated physical address geocoding and coordinates resolution proxy
Transactional Email
Automated transactional email dispatch for schedules, swaps, and security notices
Biometric Security
Enterprise FIDO2 biometric authentication (Face ID, Touch ID, Windows Hello)
Developer API
Event-driven webhook subscriptions and bi-directional REST endpoints
Connect proprietary in-house POS systems, enterprise data warehouses, or bespoke HR software. AlkaShift delivers bi-directional REST APIs, HMAC-SHA256 authenticated webhooks, and sub-millisecond event streaming.
Real telemetry from multi-unit operators who replaced manual spreadsheets, chaotic phone trees, and compliance violations with AlkaShift’s autonomous scheduling engine.
Reduced overtime by 20% in month one
“Before AlkaShift, managing schedules across 18 restaurant venues was pure chaos—constant phone trees, spreadsheet discrepancies, and rampant overtime spikes. In month one with AlkaShift’s OR-Tools CP-SAT roster engine, shift broadcast fill velocity improved by 95% and we eliminated human friction entirely.”
VP of Operations • Lumina Hospitality Group
$52,400 annual labor leakage prevented
“Multi-location fitness clubs demand strict geofenced accountability. AlkaShift’s PostGIS GPS time clock halted buddy punching across all 8 fitness clubs immediately. The automated overtime guardrails alone prevented $52,400 in annual labor leakage without adding administrative burden.”
Regional Director of Operations • Apex Fitness Clubs
14 hrs/wk manager admin time saved
“Our General Managers used to spend 15+ hours every week wrestling with spreadsheets, manual shift swapping, and scrambling for call-outs. AlkaShift gave our GMs 14 hrs/wk manager admin time saved back to coach staff on the floor. With 0 unbudgeted overtime violations across 28 venues, the ROI was instantaneous.”
Managing Partner & Multi-Unit Operator • Summit QSR Holdings
99.4% shift fill velocity within 12 minutes
“Fast casual bakery operations require dynamic scheduling at high velocity. AlkaShift’s smart shift swapping broadcasts open bakery shifts instantly to qualified staff. We achieved a 99.4% shift fill velocity within 12 minutes during morning peak surges, completely eliminating uncovered stations.”
Director of Store Operations • Corner Bakery Cafe
Scale from single-unit storefronts to multi-unit enterprise operations with zero surprise fees, automated labor compliance, and verifiable ROI from day one.
Essential scheduling & attendance for single-unit locations and independent cafes.
Included Capabilities
Autonomous OR-Tools CP-SAT scheduling, PostGIS geofencing, and POS sync for multi-unit operators.
Included Capabilities
Full multi-unit governance, Manager Logbook, and dedicated SLA for regional and national operators.
Included Capabilities
Answers to common questions about our autonomous mathematical solver, kiosk hardware, and deployment.